Mobile Pipe Fabrication Facility
Shop size: 64,000 square feet - 2 Bays
Shop Equipment Cranes
- Five-ton full length running cranes
- One-ton swing boom cranes
Pipe Cutters
- Pantograph machines
- Plasma cutting
- Abrasive cutting
Work Schedule
- Day Shift- 7 Days/Week, 11 Hours/Day (Rotating 4-Day Shift)
- Night Shift- 7 Nights/Week, 11 Hours/Night (Rotating 4-Night Shift)
- Personnel Capabilities - 100 per shift
Welding
- 1,000 amp sub arcs
- 455 STT Lincoln welding machines
Roll-Out
- 7,500 lb. positioners
- 3,000 lb. positioners
- 500 lb. positioners
- 20,000 lb. turnrolls
- 5,000 lb. turnrolls
Pipe Spool Capabilities
- Spool output: 1,000 per week
- Bar code spool tracking
Execution & Delivery
- Internal trucking
- Loading ramp
Stress Relieve Oven
Material Handling & Shipping
- All material handling as well as pick-up and delivery is executed
with Performance Contractor personnel and equipment.
Material Storage
- Significant storage space exists to insure all material is
properly stored and maintained. Material storage is specifically managed
to ensure quality control requirements are satisfied.
- Fifteen acres of pipe lay down area surrounding shop
Modular/Skid Fabrication & Construction
- Extensive modular and skid experience
- Design build experience
- All discipline turnkey capabilities
- Delivery and installation upon completion
Quality Control
- Minimum Standard: B31.3 (Latest Edition)
- National Board Inspection & ASME Code Stamps-“R” , “S”, & “U”
- Shop hydro-testing
- Independent radiographic inspection on-site
Welding Processes
- SMAW, GTAW, GMAW, FCAW, SAW
- 1,000 amp subarcs
- 350 amp inverter power sources
|
|